Damages and repairs occur in a very low percentage of our container movements. If any damage above the damage-waiver level is reported, a report with the estimated cost is created. The user of the container is informed and is required to approve the estimate. After the estimate is approved, the container is repaired and invoiced. If a damage is disputed, extra inspection of the container may be required.
by SynchroNet